Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Workflow steps can be switched automatically via the switcher program.

In a classic 3-system landscape, status transitions after successful import into the next transport level into the status Signature are useful.

To configure this function, open transaction code /RTC/TM_SW.

Switcher variant for Development (to switch from status Development Current to Quality Signature):

Image RemovedImage Added

Switcher variant for Quality (to switch from status Quality Current to Production Signature):

Switcher variant for Production (archiving to Workflow History):

Activate status switcher variants:

Schedule status switcher job.